Sample run: one pallet RFQ, day by day

One illustrative event, from a one-sentence brief to a bid tab. Pick a day to replay the log up to that point. The point is the work product, the spec and the questions asked, not the result: suppliers and prices are made up, and real timing depends on the buy.

Last updated

Replay up to
  1. D0
    09:02

    Buyer Plant manager

    Describes the buy

    Types one sentence on the start page.

    Description Illustrative
    3 truckloads a month of 48x40 #2 recycled pallets, 4-way, delivered to 43215
  2. D0
    09:02

    Procurgent Procurgent

    RFQ draft with open questions

    Reads size, grade, entry, quantity, cadence and ZIP. Material, construction, load and treatment are missing, so they become questions.

    Open questions Illustrative
    • Wood, plastic or presswood?
    • Stringer or block construction?
    • Heaviest load per pallet, and racked or floor stacked?
    • Will any pallets cross a border (ISPM-15)?
    • How many pallets make one load for you?
  3. D0
    11:40

    Buyer Plant manager

    Answers and confirms

    Wood, stringer, 2,000 lb floor stacked, domestic only. Accepts companion stringers, no painted pallets. Confirms the spec.

    Locked spec Illustrative
    48 x 40 in #2 recycled wood stringer pallets, notched 4-way
    Repairs: companion stringers OK, up to 2 replaced deck boards, no painted pallets
    Load: 2,000 lb, floor stacked 3 high; no treatment (domestic)
    3 full loads per month, ongoing; ZIP 43215, dock, 07:00–14:00
  4. D1
    08:15

    Procurgent Procurgent

    Supplier longlist

    Eight recycled-pallet suppliers that deliver to the ZIP. Two are dropped: one only sells new pallets, one doesn't deliver that far. Six get the RFQ, including the incumbent.

    Longlist (fictional) Illustrative
    • Supplier A · recycled and new · delivers
    • Supplier B · recycled · delivers · incumbent
    • Supplier C · recycled and combo · delivers
    • Supplier D · recycled · delivers
    • Supplier E · recycled · delivers
    • Supplier F · recycled · delivers
    • Supplier G · new only · dropped
    • Supplier H · outside delivery area · dropped
  5. D1
    08:40

    Procurgent Procurgent

    Outreach

    The same RFQ to six suppliers, with the standing questions every pallet supplier is asked.

    RFQ email (excerpt) Illustrative
    Please quote per pallet delivered to 43215 for the spec below.
    State: pallets per full load, partial-load price, minimum order, lead time,
    payment terms, the grade you will ship in your own words, and any take-back
    credit or charge for broken pallets.
  6. D2
    10:05

    Supplier Supplier D

    A clarifying question

    Asks whether a few block pallets mixed into a load are acceptable. The spec already says stringer only, so the answer goes back from the spec without bothering the buyer.

  7. D2
    14:30

    Supplier Supplier E

    Declines

    At capacity this quarter. Removed from the event.

  8. D3
    09:12

    Supplier Supplier C

    A quote in a messy format

    Arrives as a phone-photo of a price sheet. Freight is a flat amount; the grade line says "#2 / combo".

    As received (fictional) Illustrative
    48x40 #2/COMBO .......... 8.90 ea
    Delivery 43215 ........... 900.00 / trk
    ~520 per load. MOQ 2 loads
    Terms net 15. Lead 10 days
  9. D3
    15:48

    Supplier Suppliers A, B, D, F

    Four more quotes

    Two by email, one PDF, one spreadsheet. Supplier F leaves out freight.

  10. D4
    09:00

    Procurgent Procurgent

    Follow-ups

    Asks Supplier F for a delivered price. Asks Supplier C whether it can ship #2 only, since combo departs from the spec.

  11. D4
    13:20

    Supplier Supplier C

    Answer on the deviation

    Can't guarantee #2 only at that price. The deviation stays on the bid tab as a flag.

  12. D4
    16:10

    Supplier Supplier F

    Revised quote

    Sends a delivered price, freight included.

  13. D5
    09:00

    Procurgent Procurgent

    Bid tab ready

    Five quotes on one delivered, terms-adjusted basis. One deviation and one minimum-order issue are flagged, not scored. The award is the buyer's.

Day 5: the bid tab

Sample run bid tab: 500 per order, 18,000 a year (fictional)
RankSupplierUnit priceFreight / unitDelivered / unitTermsTerms-adjusted / unitAnnual costLead timeFlags
1Supplier B (incumbent)$9.95incl.$9.95net 30$9.89$179,1003 dNone
2Supplier F$10.35incl.$10.35net 60$10.22$186,3004 dNone
3Supplier A$9.40$0.90$10.30net 30$10.23$185,4005 dNone
4Supplier D$9.60$0.76$10.36net 45$10.26$186,4807 dNone
5Supplier C$8.90$1.73$10.63net 15$10.60$191,35410 d
  • Deviates from spec: Combo grade mixed in, not #2 only
  • MOQ 1,040 is above your order of 500
  • Your order fills 96% of a load; ask for a partial-load freight price

Ranked by terms-adjusted cost at 8% a year. Flags are not scored: a top-ranked quote with a flag may still be the wrong award.

Supplier C ranks well on price but ships combo grade, which the spec excludes, and its minimum is two loads. Supplier F pays later but costs more delivered. The buyer decides; nothing here is a recommendation. Try the same arithmetic on your quotes in the bid tab.