The event lifecycle

How a sourcing event runs

One packaging buy goes through six steps: brief, spec, supplier longlist, outreach, normalization and your award. Procurgent does the legwork in each step; you confirm the spec before anything is sent and make the final decision. In early access, requests are worked with a person in the loop.

Last updated

  1. 01

    Brief

    You describe the buy in your own words: what, how many, how often, where and by when.

    Procurgent
    Reads the description and drafts a structured RFQ: category, spec fields, quantity, cadence, delivery ZIP, requirements.
    You
    One sentence is enough to start. Add anything you know: grade, size, current supplier problems.
    Output
    An RFQ draft with open questions.
  2. 02

    Spec

    The draft becomes a spec every supplier can price the same way.

    Procurgent
    Turns open questions into a short list for you, and adds the questions every supplier in the category should answer (units per load, terms, take-back).
    You
    Answer the open questions, correct anything wrong, and confirm. Nothing goes to a supplier before you do.
    Output
    A locked spec.
  3. 03

    Supplier longlist

    A list of suppliers who make or stock that category and can deliver to your ZIP.

    Procurgent
    Builds the longlist from public business information and suppliers who asked to be included, and checks each one can serve the delivery area.
    You
    Name any supplier to include or exclude, such as your incumbent.
    Output
    A longlist you can see.
  4. 04

    Outreach

    Every supplier gets the same RFQ and the same questions.

    Procurgent
    Sends the RFQ, answers suppliers' clarifying questions from your spec, follows up, and asks for revised quotes where a quote leaves something out.
    You
    Answer anything the spec didn't cover. Questions come to you once, not once per supplier.
    Output
    Quotes, in whatever form suppliers send them.
  5. 05

    Normalize

    Quotes arrive as emails, PDFs and spreadsheets. They're put on one basis.

    Procurgent
    Extracts unit price, freight, units per load, MOQ, lead time and terms, computes delivered and terms-adjusted cost, and flags deviations from the spec.
    You
    Review the bid tab. Deviations are flagged, not hidden inside a score.
    Output
    A landed-cost bid tab.
  6. 06

    Award, by you

    You pick the supplier. Procurgent never awards, signs or orders.

    Procurgent
    Nothing, unless you ask: it can tell the suppliers who weren't chosen.
    You
    Award, order and pay the supplier directly, on the terms in their quote.
    Output
    Your decision.

What are the ground rules?

How long does an event take?

It depends on the category, how complete the spec is and how quickly suppliers answer. We aren't publishing a typical figure until enough events have run to make it honest. The sample run shows one illustrative timeline.

What do I need to have ready?

What you buy today and roughly how much, a delivery ZIP, and anything you know about the spec: a photo of the current pallet or a box's maker's certificate helps. The RFQ templates list every field by category.